The scope of works include construction of 83m of B2 kerb, including 5 crossovers on Wood Street Gol Gol.  9m of B2 kerb including 3 crossovers on King Street, Gol Gol.

Kerb and channel works

Kerb and channel works

This project comprises of kerb and channel works at 3 different locations Guava Street, Red cliffs; Box Street, Merbein; 13th street, Mildura. At Guava Street, we constructed 106m of B2 kerb, 3 pram ramps and Vic roads side entry pit >3.5 mts deep; At Box Street, we constructed 77mts B2 kerb, 2 driveway laybacks and one pram ramp. At 13th Street, we constructed 82mts of B2 Kerb, 28m2 of footpath and four driveway laybacks.

Footpath, Kerb and channel, road widening projects, Mildura

Footpath, Kerb and channel, road widening projects, Mildura

This project comprises of Footpath, kerb and channel works at 5 different locations 109 Riverside Avenue, 620-622 Etiwanda Avenue and 3 sites at Karadoc avenue, Mildura. At these sites we have installed B2 kerbs, Footpaths, Pram ramps and driveway laybacks.