Murray Street Subdivision, Wentworth
B & S Earthworks provided the groundwork for the roads within a new subdivision in Wentworth. This involved supplying and compacting over 6,000 tonnes of limestone gravel, followed by the application of a two-coat seal and asphalt surfacing, as well as the installation of over 1,000m of SM2 and B2 kerbing throughout the subdivision.
Road Safety Works San Mateo & Etiwanda
Installed spike down islands at 3 locations removing existing kerb and channel, added new line marking and chevrons with the spikedown islands being filled with concrete to a minimum strength of 25MPa, with Pram Ramps and tactiles installed at each location and a 100mm x 1.5m concrete footpath at 1 location.
Benetook Avenue Shoulder Works
The project included the profiling of 150 mm depth along the road shoulders, followed by the placement and compaction of 150 mm of crushed road base consisting of 40 mm minus limestone with clay conglomerates. Works also include the application of a two-coat seal across the full length of the project. The project is located on the Main Truck Route in Mildura and covers approximately 3.3 km of road.
Road Reconstruction Works – The Crescent, Mildura
The project comprises of asphalt road reconstruction in the crescent for an area of 4556m2. The scope of the works includes removal of 140mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installation of 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.
Ontario Avenue and Twelfth Street Round About
The scope of works includes milling out the 150mm asphalt from the existing road surface and removing the existing pram ramps; and installing 275mm thick concrete infill round about, pram ramps and installing the traffic islands on the Twelfth Street and Ontario Avenue