Merle Court and Tarella Court Road Reconstruction
The project comprises of road reconstruction of Merle and Tarella court for an area of 2333m2. The scope of the works include removal of 200mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installed 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.
Benetook Avenue Reconstruction:
The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.

