Road Reconstruction Works – The Crescent, Mildura

Road Reconstruction Works – The Crescent, Mildura

Home / Road Reconstruction Works – The Crescent, Mildura

Road Construction

Home / Road Construction

Road widening for Steeline

Road widening for Steeline

The scope of works includes a 250m lane extension. This consists of 150mm thick layer of stabilised subbase, 150mm thick of class 3 base, and 195 mm thick of Asphalt: installation of stormwater drainage and semi mountable kerb.

Merle Court and Tarella Court Road Reconstruction

Merle Court and Tarella Court Road Reconstruction

The project comprises of road reconstruction of Merle and Tarella court for an area of 2333m2. The scope of the works include removal of 200mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installed 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.

Benetook Avenue Reconstruction:

Benetook Avenue Reconstruction:

The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.

1 2