Road widening for Steeline
Principal: Malidot
Description: The scope of works includes a 250m lane extension. This consists of 150mm thick layer of stabilised subbase, 150mm thick of class 3 base, and 195 mm thick of Asphalt: installation of stormwater drainage and semi mountable kerb.