Watermains Replacement – Mildura & Red Cliffs
This project involved using a hydrovac truck and excavators to safely locate the existing main and services before excavating the trench for the new water main across three separate locations. The trench was prepared with bedding sand, followed by the installation of the new water main, including hydrants and valves. The trench was then backfilled using the excavated material, and the newly installed main underwent testing to verify its integrity and ensure it met safety and project requirements. Once completed, the existing mains were grout-filled.