Benetook Avenue Reconstruction:
The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.
Home / Road widening for Steeline
Home / Road Construction
The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.