Road widening for Steeline

Road widening for Steeline

Home / Road widening for Steeline

Road Construction

Road Construction

Home / Road Construction

Benetook Avenue Reconstruction:

Benetook Avenue Reconstruction:

The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.

1 2