Benetook Avenue Shoulder Works
The project included the profiling of 150 mm depth along the road shoulders, followed by the placement and compaction of 150 mm of crushed road base consisting of 40 mm minus limestone with clay conglomerates. Works also include the application of a two-coat seal across the full length of the project. The project is located on the Main Truck Route in Mildura and covers approximately 3.3 km of road.
Road Reconstruction Works – The Crescent, Mildura
The project comprises of asphalt road reconstruction in the crescent for an area of 4556m2. The scope of the works includes removal of 140mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installation of 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.
Ontario Avenue and Twelfth Street Round About
The scope of works includes milling out the 150mm asphalt from the existing road surface and removing the existing pram ramps; and installing 275mm thick concrete infill round about, pram ramps and installing the traffic islands on the Twelfth Street and Ontario Avenue
Road widening for Steeline
The scope of works includes a 250m lane extension. This consists of 150mm thick layer of stabilised subbase, 150mm thick of class 3 base, and 195 mm thick of Asphalt: installation of stormwater drainage and semi mountable kerb.
Merle Court and Tarella Court Road Reconstruction
The project comprises of road reconstruction of Merle and Tarella court for an area of 2333m2. The scope of the works include removal of 200mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installed 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.