Road Safety Works San Mateo & Etiwanda
Installed spikedown islands at 3 locations removing existing kerb and channel, added new line marking and chevrons with the spikedown islands being filled with concrete to a minimum strength of 25MPa, with Pram Ramps and tactiles installed at each location and a 100mm x 1.5m concrete footpath at 1 location.