Installed spike down islands at 3 locations removing existing kerb and channel, added new line marking and chevrons with the spikedown islands being filled with concrete to a minimum strength of 25MPa, with Pram Ramps and tactiles installed at each location and a 100mm x 1.5m concrete footpath at 1 location.
This project involved the removal and disposal of old Side Entry Pits, Junction Pits, 100mm stormwater piping, 150mm PVC piping and installing 40m of 300mm RPM pipes, new Side Entry Pits, Junction Pits & 14m of SM2 Kerbing, backfilling back of kerbs with clean fill, top dress & seeding
Upgraded the footpaths and kerbing along Latje Road in Robinvale. This project included the removal and construction of 563m2 reinforced concrete path with driveways and installation of TGSI’s, as well as backfilling, topsoiling and grass seeding areas adjacent the footpath.
The project included the profiling of 150 mm depth along the road shoulders, followed by the placement and compaction of 150 mm of crushed road base consisting of 40 mm minus limestone with clay conglomerates. Works also include the application of a two-coat seal across the full length of the project. The project is located on the Main Truck Route in Mildura and covers approximately 3.3 km of road.
The project comprises of asphalt road reconstruction in the crescent for an area of 4556m2. The scope of the works includes removal of 140mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installation of 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.
The scope of works includes excavation, grading, and compaction of existing Subgrade; installation of stormwater system for netball court; and constructed base pavement and stabilised subbase and poured 100mm thick concrete court pavement and applied of acrylic surface treatment.
The scope of works includes milling out the 150mm asphalt from the existing road surface and removing the existing pram ramps; and installing 275mm thick concrete infill round about, pram ramps and installing the traffic islands on the Twelfth Street and Ontario Avenue
The scope of works includes a 250m lane extension. This consists of 150mm thick layer of stabilised subbase, 150mm thick of class 3 base, and 195 mm thick of Asphalt: installation of stormwater drainage and semi mountable kerb.
The scope works includes the installation 416 mts of 1200 Dia Class 2 RCP including 7 junction pits. To install the storm water drainage, we installed the 1200 Dia pipe >4.5 mts deep with a grade of 0.129% to 0.170%.
The scope of works include construction of 83m of B2 kerb, including 5 crossovers on Wood Street Gol Gol. 9m of B2 kerb including 3 crossovers on King Street, Gol Gol.
The project comprises of road reconstruction of Merle and Tarella court for an area of 2333m2. The scope of the works include removal of 200mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installed 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.
This project comprises of kerb and channel works at 3 different locations Guava Street, Red cliffs; Box Street, Merbein; 13th street, Mildura. At Guava Street, we constructed 106m of B2 kerb, 3 pram ramps and Vic roads side entry pit >3.5 mts deep; At Box Street, we constructed 77mts B2 kerb, 2 driveway laybacks and one pram ramp. At 13th Street, we constructed 82mts of B2 Kerb, 28m2 of footpath and four driveway laybacks.
This project comprises of Footpath, kerb and channel works at 5 different locations 109 Riverside Avenue, 620-622 Etiwanda Avenue and 3 sites at Karadoc avenue, Mildura. At these sites we have installed B2 kerbs, Footpaths, Pram ramps and driveway laybacks.
The project comprises of demolishing existing concrete pram ramps and traffic islands. Construction of B2 and M2 kerb, then construction of traffic islands to suit the new pedestrian crossing and installing road base layers for 2 coat seal.
Upgrading all the footpath, kerb, and a section of road in the main street of Ouyen. The project included the removal and construction of around 800 M2 of concrete path with driveways and coloured concrete sections, 300 Meters of B2 kerb, Road pavement.
The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.
The scope of works includes installation of 100mm thick concrete court pavement and application of acrylic surface treatment.