Road widening for Steeline

Road widening for Steeline

The scope of works includes a 250m lane extension. This consists of 150mm thick layer of stabilised subbase, 150mm thick of class 3 base, and 195 mm thick of Asphalt: installation of stormwater drainage and semi mountable kerb.

Ontario Avenue and Twelfth Street Round About

Ontario Avenue and Twelfth Street Round About

The scope of works includes milling out the 150mm asphalt from the existing road surface and removing the existing pram ramps; and installing 275mm thick concrete infill round about, pram ramps and installing the traffic islands on the Twelfth Street and Ontario Avenue

Henshilwood Netball Courts at Henshilwood Reserve

Henshilwood Netball Courts at Henshilwood Reserve

The scope of works includes excavation, grading, and compaction of existing Subgrade; installation of stormwater system for netball court; and constructed base pavement and stabilised subbase and poured 100mm thick concrete court pavement and applied of acrylic surface treatment.

Road Reconstruction Works – The Crescent, Mildura

Road Reconstruction Works – The Crescent, Mildura

The project comprises of asphalt road reconstruction in the crescent for an area of 4556m2. The scope of the works includes removal of 140mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installation of 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.

Trentham sewer main

The project comprises of laying 5.8 kms of PE 100 110mm PN12.5 sewer pipe including installation of 13 air valves and 3 scour valves. This was a 3-month project connecting and installing the new sewer main from Trentham Caravan Park and Service Station to the existing line.

Hardstands at various locations

The scope of works includes 3m x 2m concrete slabs for the purpose of accommodating cages, mobile bins or skip bins to collect glass waste at Werrimull Transfer Station, Cullulleraine Transfer Station, Nangiloc Transfer Station, Walpeup Transfer Station, Underbool Transfer Station, and Ouyen Landfill.

16th Street and Riverside Avenue Stormwater Drainage works

16th Street and Riverside Avenue Stormwater Drainage works

The scope works includes the installation 416 mts of 1200 Dia Class 2 RCP including 7 junction pits. To install the storm water drainage, we installed the 1200 Dia pipe >4.5 mts deep with a grade of 0.129% to 0.170%.

Wood Street and King Street Kerb replacement works

Wood Street and King Street Kerb replacement works

The scope of works include construction of 83m of B2 kerb, including 5 crossovers on Wood Street Gol Gol.  9m of B2 kerb including 3 crossovers on King Street, Gol Gol.

Merle Court and Tarella Court Road Reconstruction

Merle Court and Tarella Court Road Reconstruction

The project comprises of road reconstruction of Merle and Tarella court for an area of 2333m2. The scope of the works include removal of 200mm thick of existing wear course and stabilise the existing base to a depth of 200mm with 70/30 slag lime, and installed 150mm thick of class 3 road base on top of stabilisation, 50mm thick size of type H asphalt as a final layer.

Springfield Drive Drainage Works

The scope of works includes installation of 450mm Día PE pipe of 68 Metres and connecting it to an existing 825 mm Dia stormwater pipe and construction of new junction pit.

Kerb and channel works

Kerb and channel works

This project comprises of kerb and channel works at 3 different locations Guava Street, Red cliffs; Box Street, Merbein; 13th street, Mildura. At Guava Street, we constructed 106m of B2 kerb, 3 pram ramps and Vic roads side entry pit >3.5 mts deep; At Box Street, we constructed 77mts B2 kerb, 2 driveway laybacks and one pram ramp. At 13th Street, we constructed 82mts of B2 Kerb, 28m2 of footpath and four driveway laybacks.

Footpath, Kerb and channel, road widening projects, Mildura

Footpath, Kerb and channel, road widening projects, Mildura

This project comprises of Footpath, kerb and channel works at 5 different locations 109 Riverside Avenue, 620-622 Etiwanda Avenue and 3 sites at Karadoc avenue, Mildura. At these sites we have installed B2 kerbs, Footpaths, Pram ramps and driveway laybacks.

Symonds Court Drainage Upgrade, Mildura:

The scope of works includes installation of 315 mm Dia PE pipe of 163 Metres and construction of 4 Junction pits & 1 double side entry pit.

Construction of Pedestrian Access Points – Karadoc Avenue, Mildura:

Construction of Pedestrian Access Points – Karadoc Avenue, Mildura:

The project comprises of demolishing existing concrete pram ramps and traffic islands. Construction of B2 and M2 kerb, then construction of traffic islands to suit the new pedestrian crossing and installing road base layers for 2 coat seal.

Ouyen CBD upgrade:

Ouyen CBD upgrade:

Upgrading all the footpath, kerb, and a section of road in the main street of Ouyen. The project included the removal and construction of around 800 M2 of concrete path with driveways and coloured concrete sections, 300 Meters of B2 kerb, Road pavement.

Trade waste sewer main air valve replacement:

The scope of works includes upgrade of new valves and installation of new air filters at 21 locations.

Benetook Avenue Reconstruction:

Benetook Avenue Reconstruction:

The scope of works includes installation of kerb; road reconstruction with an area of 3050 m2 includes 200mm thick stabilisation with 85/15 slag and lime; 7omm thick of type SI; and 40 mm thick of type H asphalt.

Cullulleraine netball court construction:

Cullulleraine netball court construction:

The scope of works includes installation of 100mm thick concrete court pavement and application of acrylic surface treatment.